West Yorkshire · Operational industrial site
Lead project · Fleet electrification
480 kW infrastructure delivered without stopping the operation.
A multinational milling business required a high-output charging installation across an active HGV route. We engineered and delivered the power, distribution, buried infrastructure, equipment bases, communications and commissioning as one coordinated package.
The programme was planned around live milling and vehicle movements, allowing the customer to remain operational throughout the works.
- 480 kWPower unit
- 8Charging connections
- 120 mBuried cable route
Selected case studies
Different challenges.
Practical solutions.
Our role changes with the project, but the standard stays consistent: understand the requirement, engineer the interfaces and prove the finished system.
March 2025eHGV charging · ADM Milling, Corby
A dedicated connection for 360 kW charging.
Following appraisal of the existing infrastructure, we worked with the ICP and DNO on a dedicated high-voltage connection point and low-voltage transformer. M&N delivered the design, electrical installation, civils and commissioning.
- 360 kWDC charger
- HV/LVCoordinated supply
September 2025Commercial solar · Springfield Commercial Centre
100 kWp phased with a wider development.
Commissioned by a commercial solar EPC contractor, the installation was coordinated with the main construction programme. Our engineers completed the electrical design, installation and commissioning.
- 100 kWpPV system
- PhasedProject delivery
November 2025Integrated energy · Croft Cargo, Cleckheaton
Three-phase upgrade, storage, backup and EV charging.
The project brought an existing single-phase solar installation into a re-engineered three-phase system. Our scope included DNO liaison, site repowering, primary and secondary distribution, phase allocation and balancing, battery backup across each phase, networking and 22 kW EV charging.
- 3 phaseSupply upgrade
- 22 kWEV charging
- IntegratedSolar and backup
December 2024Destination charging · University of Warwick
Five dual-outlet 22 kW charging stations.
Working for a principal contractor, we designed and installed the feeder pillar, distribution board, load management, communications and dedicated circuits, together with charger-specific precast foundations.
- 5Dual-outlet stations
- 22 kWCharging equipment
January 2026Partner delivery · Whins Brow Court
Solar, storage and whole-home backup in two days.
Delivered for a solar EPC contractor and commercial funder, the project combined layout, electrical design, roofing, installation and commissioning within the available space and existing electrical system.
- 5 kWpSolar PV
- 27 kWhBattery storage
- 2 daysSite delivery
Your project next
Have a demanding site or unusual brief?
Bring us in early. We can help define the electrical scope, resolve the interfaces and establish a buildable route to delivery.
Discuss your projectThe detail matters. So does the result.
Selected projects showing how we solve complex electrical and clean-energy requirements in live commercial environments.
Have a demanding site or unusual brief?
Bring us in early. We can help define the electrical scope, resolve the interfaces and establish a buildable route to delivery.
Selected projects